ARSS Infrastructure Projects Limited Site Search Home | Sitemap | FAQ | Support |

Ongoing projects

SL.NO. NAME OF WORK NAME OF EMPLOYER
1 Improvement to Nayagarh-Jagannathprasad -Bhanjanagar Road (SH-21) from 70/000 Km. to 80/300 Km. under C.R.F. E.E. (R&B) Division, Bhanjanagar
2 Construction of Koshila Dam and its Apportentant works in Dist. Panchakula. Supertending Engineer SYL WS Circle Ambala
3 Construction of 4-lane Approach Road from NH.-31 to plant side of Koderma TPS in Jharakhand including a road over bridge(ROB) on the Koderma-Ranchi Railway Track Group General Manager,Highway Division
4 Improvement to Nayagarh-Jagannathprasad-Bhanjanagar road (SH-21) from 38/0 to 45/500 & 5/0200 to 60/020 km under C.R.F. E.E. (R&B) Division, Bhanjanagar
5 Improvement to Vijayawada-Ranchi Corridor (Berhampur to Phulbani) from 128/000 to 134/000 Km of Berhampur -Phulbani road (SH-7) under Planning Commission grant E.E. Phulbani (R&B) Division, Phulbani.
6 Improvement to Vijayawada-Ranchi Corridor (Berhampur to Phulbani) from 128/000 to 134/000 Km of Berhampur -Phulbani road (SH-7) under Planning Commission grant General Manager (Commercial) Jindal Steel & Power Limited
7 Const. of RCC Road (2 Lanex7.5 mtrsx10.2 kms), including Earth work, Sub-base, WBM, Drains, Footpath & Drivider etc. at our JSPL,Angul(Orissa) Project Site General Manager (Commercial) Jindal Steel & Power Limited
8 Construction new embakment and road at submersible potion of Balangir-Kantabanjhi -Bangamunda Chandutora Road SH-49 from 16/975 km to 21/600 km including construction of HL Bridge over chudapalli Nullah at RD . 20/750km. Executive Engineer Kantabanjhi (R&B) Division
9 Construction of Underpass at Gurjar Ki Thadi Chaurah,at Jaipur Zonal Engineer (PDC-II),JDA, Jaipur
10 Improvement of Riding qulity to NH-201 from km 256/0 to km 270/0 km for the year 2008-09 Executive Engineer NH Division, Bolangir
11 Construction of Tailing Dam at NALDA Project Director
BRPL, IPICOL Annex Building, 5th & 6th Floor, Janpath, Bhubaneswar
12 Baranga Bye pass connecting (MDR-77) with Bhubaneswar Baranga road f rom 0/600 Km to 1/878 Km. E.E Cuttack R&B Division
13 Improvement of Old cuttack-Ganjam road from Baranga to Pitapalli road Such as Improvement & widening to Old Cuttack ganjam Road(MDR-77) from(8/400 km to 16/600 km) under A.C.A Programme for the Year 2009-10 E.E.Bhubaneswar R&B Division
14 Improvement to Konisi Dumudumi Mandrajpur Road from 0.0 to 12.000km in the district of Ganjam under NABARD Assistance, RIDF-XV Executive Engineer Ganjam (R&B) Division No.1
15 construction of In Plant Roads (including supply of all materials) about 12 Km at Electrosteel Steel Ltd., Siyaljon Project, Bokaro (Jharkhand) Sr. General Manager, Electrosteel Ltd.
16 Four Laning of Chittourgarh - Kapasan- Mavli- Dabok Road SH-9 (0.00 at Debok) 50 km to 60.00 (RSRDS) Project Director, RSRDC, Udaipur
17 Construction of bridge on 100' wide road along railway line from Sector Jn 66A/66B, 81/82 upto Sector Jn 81/82, 83/84 & half Km. 150' wide Sector dividing road 81/84. Divisional Engineer (C-I), GMADA, Mohali
18 Modification to the existing road from Gate no-04 to Sandhakud Basti at Paradeep port (Balance work) Executive Engg.. Harbour work Division No-II, ParadeepPort Trust.
19 Improvement such as providing double-lane rigid pavement carriage way with paved shoulders of 1.5m on both sides to Cuttack-Paradeep road (SH-12) from 0/00 to 43/00 Km. E.E. (R&B) Division, Jagatsinghpur
20 BRTS-II, Jaipur.  
21 Improvement to Bhanjanagar Town Road Loharkhandi bridge to Irrigation Office. Executive Engineer Bhanjanagar (R&B) Division
Powered byCosmoquest
Home | Media Room | Share Price Data | CSR | News | Events | Photo Gallery | FAQ | Bankers |Contact Us
Copyright © 2011 ARSS Infrastructure Projects Limited, All rights reserved. Feedback Form | Employee Login | Location | Sitemap