ARSS Infrastructure Projects Limited Site Search Home | Sitemap | FAQ | Support |

Current Projects

  • Widening and Strengthning of Bhawanipatna-Gunupur-Kashipur road (SH-44) from 0/0 to 13/0 and 42/940 to 48/840 km. under SHDP EPC.(Woodhil Infra)
  • Widening & Strengthening of Jamujhadi-Basudevpur- Dhamara road (SH) to 2- lane without paved shoulder from 18/800Km to 22/750Km & from 27/100Km to 60/470Km.(ARSS)
  • Widening & strengthening of Parvatipur-Laxmipur Road (SH-51) from 12/600 to 42/830, 44/280 to 53/900, 54/900 to 59/200 and 65/180 to 68/380 KM on EPC mode. (WOODHILL)
  • Widening and Strengthening of Berhampur-Tamana-Chikiti-Surangi-Mandara Road (SH-22) to two lane without Paved Shoulder from 0/00 km. to 1/00 km. & 2/0 km. to 32/0 km. on EPC Mode (WOODHILL)
  • Widening to two lane from Km. 212/700 to 253/700 Km. and Km. 281/700 to 311/700 of NH 326 (erstwhile km from Km. 0/0 to 30/0 Km. and Km. 58/0 to 99/0 of SH-4 under VR Corridor in the state of Odisha under EPC Mode.(ARSS)
  • Construction of HL bridge over river Brahmani near Jenapur at 15th Km of Kuakhai to NH-200 road via Jenapur in the district of Jajpur under NABARD Assiatance. (ARSS)
  • Excavation and construction of Mamiyan Distributary including all structures offtaking at RD 47.117 km of LMC of LIIP (Bangamunda) (ARSS)
  • Canal Lining and sysytem rehabilitation programe (CLSRP) of Parjang Branch canal oftaking at RD 28.899 Km of left bank canal of rengali irrigation project (PBC from RD 00Km to 11.587Km with its off taking distribution system reach-I) (ARSS)
  • Construction of a new 2 lane Highway from km 38.00 to km 71.00(Length-33km) in Mizoram to Support Kaladan multi model transit transport Project in phase "A" of SARDP-NE (package-II)No. AGM-5/CE-HW/2010-11 Dtd. 01.10. 2010 (ATLANTA-ARSS)
  • Works in connection with doubling of BOLANGIR (EX)-TITLAGARH (IN) section (63.193 kms) part of SAMBALPUR-TITLAGARH Doubling of East Coast Railway in the state of ODISHA, India. (L & T)
  • Execution of balance work for construction of Road-bed, Major & Minor bridges, Track Linking (Excluding supply of Rails, ordinary track sleepers & thick web switches, outdoor signaling and electrical (General) works in connection with doubling of Lakhani (EX) -arand (in) section (68.936 kms) part of Raipur-Titilagarh doubling in Sambalpur division of East coast Railway in the state of Odisha & Chhatisgarh, India.
  • Package 2C: Construction of Roadbed, Station Buildings, Passenger menities, Minor bridges, General Electrical works in connection with New B.G. Railway Line from Nuagaon Km 68.300 TO Paradeep 81.20 on Khurda Road Division of East Coast Railway in the state of Orissa, India.
  • Construction of private rail-way siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for Darlipali STPP of NTPC Limited in Sundergarh Distt in Odisha state–from Ch. 6.000 to Ch. 12.460 – Pkg. 1 in Darlipali- Dulanga MGR section. (ARSS)
  • Widening existing 2 lane to 2 lane with 1.5m wide paved shoulder from Km 0/0 to 81/0 and Km 93/0 to 119/0 of NH-157 in the state of Odisha on EPC mode. (ARSS)
  • Widening existing 2 lane to 2 lane with 1.5m wide paved shoulder from km 50/000 - 140/900 of NH 57 in the state of Odisha on EPC mode. (ARSS)
  • Earthwork in formation (excluding Blanket), minor bridges between Km 19.000 to Km. 47.000 and 3 no.s of Steelgirder bridges, 8 no.s of Road Over Bridges between Km 19.000 to Km 67.000 in connection with Angul-Sukinda new railway BG line in the state of Odisha, India. (WOODHILL HILWAYS JV)
  • ALL BALLAST SUPPLY
Powered byCosmoquest
Home | Media Room | Share Price Data | CSR | News | Events | Photo Gallery | FAQ | Bankers |Contact Us
Copyright © 2011 ARSS Infrastructure Projects Limited, All rights reserved. Feedback Form | Employee Login | Location | Sitemap