Current Projects
- Widening & Strengthening of Jamujhadi-Basudevpur- Dhamara road (SH) to 2- lane without paved shoulder from 18/800Km to 22/750Km & from 27/100Km to 60/470Km.(ARSS)
- Widening to two lane from Km. 212/700 to 253/700 Km. and Km. 281/700 to 311/700 of NH 326 (erstwhile km from Km. 0/0 to 30/0 Km. and Km. 58/0 to 99/0 of SH-4 under VR Corridor in the state of Odisha under EPC Mode.(ARSS)
- Construction of HL bridge over river Brahmani near Jenapur at 15th Km of Kuakhai to NH-200 road via Jenapur in the district of Jajpur under NABARD Assiatance. (ARSS)
- Construction of a new 2 lane Highway from km 38.00 to km 71.00(Length-33km) in Mizoram to Support Kaladan multi model transit transport Project in phase "A" of SARDP-NE (package-II)(ATLANTA-ARSS)
- Works in connection with doubling of BOLANGIR (EX)-TITLAGARH (IN) section (63.193 kms) part of SAMBALPUR-TITLAGARH Doubling of East Coast Railway in the state of ODISHA, India. (L & T)
- Execution of balance work for construction of Road-bed, Major & Minor bridges, Track Linking (Excluding supply of Rails, ordinary track sleepers & thick web switches, outdoor signaling and electrical (General) works in connection with doubling of Lakhani (EX) -arand (in) section (68.936 kms) part of Raipur-Titilagarh doubling in Sambalpur division of East coast Railway in the state of Odisha & Chhatisgarh, India.
- Package 2C: Construction of Roadbed, Station Buildings, Passenger menities, Minor bridges, General Electrical works in connection with New B.G. Railway Line from Nuagaon Km 68.300 TO Paradeep 81.20 on Khurda Road Division of East Coast Railway in the state of Orissa, India.
- Construction of private rail-way siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for Darlipali STPP of NTPC Limited in Sundergarh Distt in Odisha state–from Ch. 6.000 to Ch. 12.460 – Pkg. 1 in Darlipali- Dulanga MGR section. (ARSS)
- Widening existing 2 lane to 2 lane with 1.5m wide paved shoulder from Km 0/0 to 81/0 and Km 93/0 to 119/0 of NH-157 in the state of Odisha on EPC mode. (ARSS)
- Widening existing 2 lane to 2 lane with 1.5m wide paved shoulder from km 50/000 - 140/900 of NH 57 in the state of Odisha on EPC mode. (ARSS)
- Earthwork in formation (excluding Blanket), minor bridges between Km 19.000 to Km. 47.000 and 3 no.s of Steelgirder bridges, 8 no.s of Road Over Bridges between Km 19.000 to Km 67.000 in connection with Angul-Sukinda new railway BG line in the state of Odisha, India. (WOODHILL HILWAYS JV)
- Third Line Work between Rourkela and Jharsuguda Stations (Section II) - Execution of Earthwork in Formation, Construction of Minor Bridges, P. Way Linking Works with Supply of Track Ballast and other related works between Dharuadhi Station yard to Jharsuguda Station Yard from Km: 486.50 Km: 515.00. (ARSS Share: 51%)
- Jarapada - Budhapank with flyover at Talcher Road – 3rd & 4th line: Execution of earthwork, minor bridges & other allied works (Km: 525.133 to Km: 483.047 i.e. 35.5 Km-3rd Line & 42.00 Km-4th line approx. - excluding flyover portion at Talcher Road). (ARSS Share : 51%)
- Budhapank - Salegaon via. Rajathagarh – 3rd & 4th line: Execution of earthwork, minor bridges & other allied works (Km: 483.047 to Km: 398.166 i.e 2 x 85 = 170 Km. approx.) (ARSS Share : 51%)
- Khurda Road – Bolangir New B. G. Link Project- Execution of Earthwork in formation, Minor bridges and other allied works from Km.80.00 to Km.93 from Khurda end in between Nayagarh- Nuagaon and Daspalla of East Coast Railway. (ARSS Share : 51%)
- JAGDALPUR –KORAPUT Doubling Project- Execution of Earthwork in formation, Minor bridges, Protection works and other allied works from Km.263.300 to Km.223.500 of Kotpar Road (Excluding) – Charamula kusumi (Including) – Khadapa (Including) – Dhanapur (Including) –Jeypore(Including) – Chatariput (Including) section in connection with KK line doubling of WAT Division, East Coast Railway. ARSS Share : 51%
- Construction of SIX Lane ROB in lieu of LC-70, Sitapura, on JP-SWM Railway line, Jaipur. ARSS Share 51%
- Soil investigation, design of bridges, execution of earth work, minor bridges, major bridges, RUBs, extension of FOB, Staff Quarters and other service buildings, supply of ballast and other miscllaneous works in Lajkura-Raigarh section in connection with the construction of 4th line between Jharsuguda-Bilaspur. (ARSS Share: 51%)
- Earthwork in embankment / cutting including blanketing, side drains, retaining/ toe wall, construction of Minor bridges and removal of infringements of signaling cables/ equipment’s with other allied works in Bina- Dhaura Section (34.52 KM) in connection with Bina-JHS 3rd Line project (Zone-I). ARSS Share : 51%
- Earthwork in embankment/ cutting including blanketing, side drains, retaining/ toe wall, construction of Minor bridges and removal of infringements of signaling cables/ equipment’s with other allied works in Babina-Jhansi Section ( 25.35 Km) in connection with Bina- JHS 3rd Line project (Zone-V). ARSS Share : 51%
- Earthwork in embankment/ cutting including blanketing, side drains, retaining/ toe wall, construction of Minor bridges and removal of infringements of signaling cables/ equipment’s with other allied works in Bijroutha-Babina Section (35.58 Km) in connection with Bina - JHS 3rd Line project (Zone-IV). ARSS Share 51%
- Construction of Important Bridge No. 1086/01 on Betwa River having 20/24.40 m. spans of composite girders including earthwork & construction of Minor bridges on approaches in connection with Bina-JHS 3rd Line project. ARSS Share 51%
- Construction of Major Bridges (07 Nos.) and Earthwork in approaches, including protection and other ancillary works in Bina-Lalitpur Section (62.66Km) in connection with Bina-Jhansi 3rd Line Project (Zone-A). ARSS Share 51%
- Execution of work of Track Linking (Excluding supply of Rails, Thick Web Switches and PSC Line Sleeper) OHE, S&T and other allied works from Haridaspur (KM 0.00) to Kendrapara (KM 43.873) including Kendrapara Yard in connection with construction of New BG Railway Line from Haridaspur to Paradeep (KM 81.200) in Khurda Road Division of East Coast Railway in the State of Odisha, INDIA. ARSS Share 75%
- Bhadrak - Nergundi 3rd Line: Supply of machine crushed hard stone ballast in connection with doubling between Kapilas Road and Salegaon stations under KUR Division of E.Co.Railway.
- Supply of Ballast in connection with 3rd & 4th line work between Salegaon to Rajathgarh in KUR Division. (ARSS share 51%)
- Koraput - Singapur Road Doubling Project: Construction of Major Bridge No. 1 (1x18.3m Composite Girder, RUB), Br.No3 (5x30.5m composite Girder), Br.No.6 (5x30.5 Composite Girder), Br. No.12 (1x12.2m +1x30.5m+ 1x12.2m Composite Girder), Br. No.19 (1x12.2m +1x30.5m+1x12.2m Composite Girder), Br. No. 21A (1x36.0m Composite Girder, ROB), Br.NO.25(2x9.15m RCC Box) &, Br.NO.26(3x6.1m RCC Box) between Koraput -Damanjodi stations in connection with Doubling of Koraput - Singapur Road section of WAT Division, East Coast Railway. (ARSS Share 51%)
- JAGDALPUR - KORAUT DOUBLING: Supplying, transporting and stacking of 90,000 cum of contractor's hard stone machine crushed Track Ballast as per Railway specifications between Ambagaon - Khadapa stations (from Km.270.40 to Km.244.00) on KK line of WAT Division of East Coast Railway. (ARSS Share 51%)
- Supplying and stacking of contractor's hard stone machine crushed Track Ballast as per Railway specifications between Jarpada and Talcher Road in connection with Talcher-Sambalpur doubling. (ARSS Share 51%)
- Execution of balance work of roadbed, major & minor bridges, track linking, S&T service buildings, other civil works and outdoor signalling in connection with doubling work Between BLSN to RVH (In) Section (Excluding ANMD yard) and residential & other service buildings at MSMD & ANMD of Sambalpur Division of East Coast Railway & Raipur Division of SECR in the state of Chhattisgarh, INDIA a part of Raipur – Titlagarh Doubling
- Excavation & Cement Concrete Lining of Baitarani Left Bank Canal (BLBC) from RD 24.08 Km to RD 28.50 Km. Including construction of Structures and Service Road.
- Package-1: Execution of balance works for construction of major bridges (excluding the work of bridge superstructures of steel open web and composite girders) of bridge no. 326 (3x30.5m open web steel girder), 341 (3x30.5m composite steel girder welded type ), 348 (7x30.5m open web steel girder), 352 (3x12.2m PSC), 355 (5x30.5m open web steel girder), 367 (6x30.5m composite steel girder welded type) and 390 (10x30.5m open web steel girder) in connection with doubling between Jaroli (incl.) and Jakhapura (incl.) (170.903 km) on Khurda road division of east coast railway in the state of Odisha, India.
- Package-2: Execution of balance works for construction of major bridges (excluding the work of bridge superstructures of steel open web girders) of bridge no. 24 (3x18.3m PSC), 43 (3x18.3m PSC), 58 (1x30.5m open web steel girder), 66 (3x45.7m open web steel girder), 97 (3x18.3m PSC) in connection with doubling between Jaroli (incl.) and Jakhapura (incl.) (170.903 km) on Khurda road division of east coast railway and Chakradharpur division of south eastern railway in the state of Odisha, India.
- Supply of 40,000 cum. of hard stone machine crushed ballast of 50 mm size at Kenduapada Depot & loading the same into any type of Railway wagon for Khurda Road Division.
- At NAM/BOJ - Manufacturing, supplying and stacking (from private quarry) of 50mm machine crushed stone ballast in Depot and loading the same into hopper/wagon in TSK Division. (ARSS share: 51%)
- At Tangla: Manufacturing, supplying and stacking of 50/60mm size machine crushed stone ballast in Depot and loading the same into hopper in Rangiya Division. (ARSS share: 51%)
- Koraput-Singapur Road Doubling Project: - Supplying, transporting and stacking of 97,000 cum of contractor's hard stone machine crushed Track Ballast as per Railway specifications between Lakshmipur Road - Tikiri stations (including yard) from 61.17 Km to 83.06 Km on KR line of WAT Division of East Coast Railway. ARSS Share : 51%
- Widening and up gradation to 2 lane with paved shoulder configuration and geometric improvement from km 298.000 to km 339.000 on Aizawl-Tuipang Section of NH-54 in the State of Mizoram (Package-7) with JICA loan assistance Project on EPC mode. ARSS Share : 26%
- Rourkela - Jharsuguda 3rd line work - Supply & Spreading of track Ballast in between Sogra and Jharsuguda under the jurisdiction of Dy.Chief Engineer (Con)/Jharsuguda, South Eastern Railway
- Construction of Bridge No-677(17x45.70m-Open web through girder) on Tel River & Major Bridge No 675 (1x30.50m Open web through girder) over SH-41 between Km 237.200 to 238.400 of Khurda Road-Bolangir New B.G Rail link Project. (ARSS Share: 51%)
- Package- 2 - “Track Linking (Excluding Supply of Rails , Sleepers, Thick Web Switches), S&T and OHE Works between Km.47 to Km.97 in connection with construction of Angul-Sukinda New BG Rail Link of 58.961 Track Km (Between Rangamatia to Baghuapal including Tie Lines at Tomka) on Khurda Road Division of East Coast Railway, in Odisha State, India”. (ARSS share: 80%)
- Construction of Earthwork, Bridge Work, Protection Work of minor and major bridge, slope of bank, Buildings, site facilities, General Electrical works and other miscellaneous work in section Deobhal (IN) – Barpali (IN) in connection with the doubling of Sambalpur – Titlagarh in Sambalpur division of East Coast Railway. (ARSS Share: 60%)
- Package- A1 - “Construction of roadbed and Minor Bridge, ETC works in connection with Doubling between Mau (MAU) (Excluding) 0.00 Km and Azamgarh (AMH) (Including) Km 43.50 (Total 43.50 Km) in Varanasi Division of North Eastern Railway, Uttar Pradesh, India”(ARSS Share: 60%).
- Package - B1 - “Construction of roadbed, Major and Minor Bridge, ETC works in connection with Doubling between Azamgarh (AMH) (Excluding) 43.50 Km and Shahganj (SHG) (Including) 99.75 (Total 56.25 Km) in Varanasi Division of North Eastern Railway, Uttar Pradesh, India”(ARSS Share: 60%)
- Package-5A-"Construction of Roadbed, Minor Bridges, Service Buildings including amenities, Passenger amenities at stations and related works along with General Electrical works in connection with 3rd Line between Rayagada (Excl) (KM 343.90) - Jimidipeta (Excl) (KM 356.518) on Waltair Division of East Coast Railway in Odisha State, India.(ARSS Share: 75%)
- Package-5A-"Construction of Roadbed, Minor Bridges, Service Buildings including amenities, Passenger amenities at stations and related works along with General Electrical works in connection with 3rd Line between Rayagada (Excl) (KM 343.90) - Jimidipeta (Excl) (KM 356.518) on Waltair Division of East Coast Railway in Odisha State, India.(ARSS Share: 60%)
- Construction of handling platforms, Railway track, truck parking area, buildings and other ancillary facilities for IFFCO at MMLP Paradip, Odisha.(ARSS Share: 51%)
- Construction of H.L.Bridge over river Gobari at Ch.0/250 Km and road from 0/000 Km to 0/700 Km for construction of alternative road to Kendrapara Town under State Plan,in Odisha State.
- Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 0.00 to Km 44.35 (Package-1 ) in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE.(ARSS Share: 51%)
- Construction of ROB at Ch-62291 between Tangaria to Bhuban RCC Box Bridge No. 125 (2x7.5x7.563) under Angul-Sukinda New BG Rail Link Project on Khurda Road Division, East Coast Railway in Odisha State, India
- Execution of P-Way Linking works (excluding supply of rail, ordinary track sleeper & thick web switches) including yard remodeling and other miscellaneous works like widening and extension of Platforms, FOB, Goods Platforms, Passenger amenities, Earth work, S&T works, General Electrical works and OHE/RE works in section Deobahal(IN)-Barpali(IN) in connection with the doubling of Sambalpur-Titlagarh in Sambalpur division of East Coast Railway.
- Construction of Byepass road to Kendrapara town from 0/700 Km to 2/681 Km including construction of H.L. Bridge over river Gobari at Ch.1/300 Km under State Plan.
|